蒋庄煤矿−430水平排水系统改造方案设计与应用

    Design and Application of the Drainage System Renovation Scheme at the −430m Level of Jiangzhuang Coal Mine

    • 摘要: 由于蒋庄煤矿−430水平排水系统能力不足,最大排水能力仅为511 m3/h,未达到山东能源集团要求的1500 m3/h标准及最大涌水量2倍(即−430水平为581.4 m3/h)需求。为确保矿井安全生产,提升矿井抗灾能力,提出对−430水平排水系统进行设计改造,通过在原排水系统的基础上,更换为MD500-85×6型大功率水泵、并增设D426高规格管路及优化供电系统,构建了高效排水体系。改造后系统最大排水能力可提升至1525 m3/h,覆盖最大涌水量的5.25倍,满足安全规范及抗灾需求,为矿井持续安全生产提供了有效保障。

       

      Abstract: Due to the insufficient capacity of the −430 level drainage system at Jiangzhuang Coal Mine, with a maximum drainage capacity of only 511 m3/h, it failed to meet the 1500 m3/h standard required by Shandong Energy Group and the requirement of being twice the maximum water inflow (i.e., 581.4 m3/h for the −430 level). To ensure mine safety production and enhance the mine's disaster resilience, a design renovation for the −430 level drainage system was proposed. Based on the original system, the renovation involved replacing it with high-power pumps of type MD500-85×6, adding high-specification D426 pipelines, and optimizing the power supply system, thereby constructing an efficient drainage system. After the renovation, the system's maximum drainage capacity can be increased to 1525 m3/h, covering 5.25 times the maximum water inflow, which meets safety regulations and disaster resilience requirements, providing an effective guarantee for the mine's continuous safe production.

       

    /

    返回文章
    返回