高位与顺层斜交钻孔协同抽采技术研究

    Research on the Collaborative Extraction Technology of High-Position and Strike-Inclined Crossed Boreholes

    • 摘要: 为了解决回采期间工作面瓦斯超限问题,通过理论分析和现场实测相结合的方法,研究采动覆岩移动破坏规律,划分采场上覆岩层“竖三带”范围,明晰煤岩层裂隙分布特性,研究采动影响与卸压瓦斯运移聚集的关系;在此基础上,研究采场覆岩瓦斯富集区域,模拟分析工作面前方煤层卸压区范围及瓦斯运移规律,优化高位钻孔和采动区本煤层斜交钻孔的布置参数;形成系统的综采工作面采动区卸压瓦斯协同抽采方案。

       

      Abstract: In order to solve the problem of overrun gas in the working face during mining, the method of combining theoretical analysis and field measurement was used to study the law of movement and failure of mining overburden rock, divide the range of "vertical three belts" of overlying rock strata in stope, clarify the fracture distribution characteristics of coal and rock seams, and study the relationship between mining influence and pressure relief gas migration and accumulation. On this basis, the gas enrichment area of the overburden rock in the stope was studied, the range of the coal seam pressure relief area and the gas migration law in front of the working were simulated and analyzed, and the layout parameters of the high-level borehole and the diagonal borehole of the coal seam in the mining area were optimized. A systematic collaborative extraction scheme for pressure relief gas in the mining area of the fully mechanized mining face was formed.

       

    /

    返回文章
    返回