回采巷道掘进期间过断层围岩变形特征及支护研究

    Study on the deformation characteristics and support of peripheral rock over faults during the excavation of back-mining roadway

    • 摘要: 针对回采巷道在掘进期间过断层施工速度缓慢,巷道围岩不易维护,从而影响开拓安全及速率等问题,通过理论分析、数值模拟分析断层对巷道围岩的破坏深度和过不同类型的断层时的影响范围,结果表明,受断层影响,巷道围岩塑性破坏区最大深度为2.56 m,掘进巷道过低落差型断层、高落差型断层及组合型断层时,加强支护范围应分别大于10、15、13 m,提出了断层影响范围内补强支护方案,并通过模拟对比分析及现场监测的方法,验证了支护方案的可靠性,保障巷道围岩的稳定性。

       

      Abstract: Aiming at the problem that the faults in the roadway during the excavation of the back-mining roadway lead to the slow construction speed and the roadway surrounding rock is not easy to be maintained, which affects the safety and rate of development, etc., the depth of damage of the faults to the surrounding rock of the roadway and the range of influence of the faults are analysed through the theoretical analysis and numerical simulation, and the result shows that, under the influence of the faults, the maximum depth of the plastic damage zone of the surrounding rock is 2.56 m, and the maximum depth of the surrounding rock is 2.56 m.When the tunnel passes through the low-drop fault, high-drop fault and combined fault, the range of reinforced support should be more than 10 m, 15 m and 13 m respectively, and the reinforced support scheme within the influence of the fault is proposed, and through the simulation and comparative analysis and on-site monitoring, the reliability of the support scheme is verified to guarantee the stability of the tunnel peripheral rock.

       

    /

    返回文章
    返回