综放工作面小煤柱巷道围岩应力分布规律研究

    Study on stress distribution of surrounding rock in small pillar roadway of fully mechanized caving face

    • 摘要: 针对井下工作面采用小煤柱护巷技术后,工作面回采期间的煤柱稳定性及安全性问题,以黑龙关煤业11605工作面为工程背景,采用力学理论分析与数值模拟等方法,对工作面回采期间小煤柱围岩应力分布特征及规律进行综合分析,并对工作面小煤柱护巷安全及巷道围岩控制体系进行分析论证,探讨了工作面回采不同阶段时小煤柱围岩应力应变变化。结果表明:建议适当增加工作面回风顺槽超前支护段距离(应不小于50 m)、超前支护强度,进一步保障超前支护段内围岩稳定性及安全性;此时,11605回风顺槽护巷煤柱稳定性及安全性可满足工作面安全高效生产的需求。

       

      Abstract: In view of the coal pillar stability and safety problems during the mining period in the underground coal face after adopting the small coal pillar roadway protection technology, taking the 11605 coal face of Helongguan coal industry as the engineering background, by means of mechanical theory analysis and numerical simulation, the stress distribution characteristics and law of surrounding rock of small coal pillar in working face are comprehensively analyzed, the safety and control system of roadway surrounding rock of small coal pillar in working face are analyzed, and the stress and strain changes of surrounding rock of small coal pillar in different mining stages are discussed. The results show that it is suggested to increase the distance (not less than 50 m) and the strength of the lead support in the return air passage of working face to further ensure the stability and safety of the surrounding rock in the lead support section, the stability and safety of coal pillar of 11605 return air gateway can meet the demand of safe and efficient production of working face.

       

    /

    返回文章
    返回