东滩煤矿3308工作面末采方案设计及应用

    Design and Application of Final Mining Plan for 3308 Working Face in Dongtan Coal Mine

    • 摘要: 为解决复杂条件影响下工作面末采支护难度大问题,以东滩煤矿3308综放工作面为工程背景,基于现场复杂工程条件及设备条件,综合考虑调斜开采、支架及运输机控制、上网方式等方面,设计制定了合理的大采高末采上网方案,并成功应用于现场,有效的保障了工作面正常回撤,简化了作业流程,提高了作业效率。

       

      Abstract: In order to solve the problem of difficulty in supporting the final mining of the working face under complex conditions, taking the 3308 fully mechanized caving working face of Dongtan Coal Mine as the engineering background, based on the complex engineering conditions and equipment conditions on site, and taking into account the control of inclined mining, support and conveyor, and grid connection methods, a reasonable plan for high mining height final mining and grid connection has been designed and developed, which has been successfully applied on site, effectively ensuring the normal withdrawal of the working face and simplifying the operation process, Improved homework efficiency.

       

    /