基于Ventsim的采区通风系统优化方案可行性研究

    Feasibility study on optimization scheme of ventilation system in mining area based on Ventsim

    • 摘要: 传统的通风系统网络解算技术存在不直观、解算程序繁琐等问题,增加了通风系统优化的工作量。以某矿通风系统为例,针对四采区煤流运输系统效率低、新工作面即将贯通及采区需风量增大等情况,提出了一系列通风系统优化方案。通过利用三维通风仿真模拟软件(Ventsim)建立全矿井三维模型的方式,对比分析了四采区优化方案实施前后矿井通风系统,特别是采区通风系统的优化效果,确定优化方案能有效解决采区存在的运输和通风问题。

       

      Abstract: The traditional ventilation system network solution technology has problems such as non-intuitive and cumbersome calculation procedures, which increases the workload of ventilation system optimization. Taking the ventilation system of a mine as an example, a series of optimization schemes of ventilation system are put forward in view of the low efficiency of coal flow transportation system in the four-mining area, the upcoming penetration of new working face and the increase of air demand in the mining area. By using the three-dimensional ventilation simulation software ( Ventsim ) to establish the three-dimensional model of the whole mine, the optimization effect of the mine ventilation system before and after the implementation of the optimization scheme of the four-mining areas, especially the ventilation system of the four-mining areas, is compared and analyzed. The optimization scheme of the four-mining areas can effectively solve the transportation and ventilation problems existing in the four-mining areas.

       

    /

    返回文章
    返回